Optimised Infrastructure Plan

Farnham OIP

The Farnham Infrastructure Programme (FIP) was presented to the public in the form of a Vision Statement, and in 2020 the people of Farnham  were invited to comment.

On the strength of comments received the Programme has now moved on to the next phase, to develop an Optimised Infrastructure Plan (OIP) which starts identifying a Farnham-wide programme of solutions to the issues highlighted in the vision.

For a summary of the Infrastructure Plan click here

The OIP is now presented as a virtual exhibition,  and a survey has now been opened, to run until 14 March. To visit the virtual exhibition and take part in the survey click here.

For more information on the FIP click here.

One thought on “Optimised Infrastructure Plan

  1. No Western Bypass. The most recent line drawn for a western bypass goes through 2 Harold Faulkner houses, grade 2 listed house, which the Farnham Society visited in early 1990s, barn dated 1820, route of St Swithins Way, which would destroy the history of the area, the heritage for future generations. No to Western Bypass.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>